CURRENT RELEASE: v5.1.17 (February 2018)

NOTE: Close Outlook before installing.

NOTE: 64-bit version requires Outlook 2010/2013/2016 64-bit. Otherwise, install the 32-bit version of gSyncit including if using Windows 64-bit.

If you encounter a problem installing the 32-bit or 64-bit version where the installer indicates you must have a specific "bit" version of Outlook installed then please click here for details on how to address this issue.

We use rapid release cycles meaning that we release in quick/short iterations resulting in frequent updates. This is opposed to longer release cycles which would otherwise delay customers receiving fixes/updates to the software. 

We send update availability notifications via the software when determined that the update includes a critical set of changes important for maintaining stable syncing. We prefer to avoid frequent software update notifications and will continue to take steps to reduce the frequency of notifications.

While not recommended, users have the option to disable the check for updates on the gSyncit settings / general panel by unchecking the option to check for updates and install updates as they choose.


v5.1.17 - February 2018 [February 12th, 2018]
  • FIX: Protect gSyncit from crashing when there is a failure writing to application log file due to local disk issues.

  • FIX: Corrects Outlook crash when using Outlook 2007 after installing the earlier gSyncit v5.1 release. Issue occurred when syncing changes from Google calendar to Outlook.

  • FIX (Critical): Corrects issue where Outlook event incorrectly shows RTF (Rich Text Formatting) control codes after installing gSyncit v5.1.13-15.

v5.1.15 - February 2018 [February 11th, 2018]
  • FIX: Corrects deserialization error when CalDav entry contains Organizer that is missing name value.

  • REV: Revision to spinning image on sync status dialog.

  • FIX: Corrects issue where syncing CalDav events with missing start date causes sync error

  • FIX: Corrects UI error where CalDav sync displayed CardDav sync.

  • FIX: Adds workaround for case where Pocket Informant recurring event end date occurs before the start date.

v5.1.13 - February 2018 [February 7th, 2018]
  • Maintenance updates.

  • FIX: Corrects line feed parsing issue syncing notes with Gmail

  • FIX: Updates error message when Outlook has an event where the end date occurs before the start date.

  • FIX: Corrects object reference error syncing with Informant Online events missing the end timezone.

  • FIX: Corrects time zone mapping for Haiti which causes CalDav sync error.

  • FIX: Corrects issue where recurring event "until" date may be incorrectly set on the Outlook event causing the event to appear 1 day longer than expected.

  • FIX: Sets Outlook contact Email1 as the primary Gmail contact email address by default.

  • FIX: Corrects issue populating the CalDav calnedar list with correct list of VEVENT resources.

  • NEW: Added support for syncing Google event HTML formatting with Outlook event RichText formatting. By default event descriptions sync as plain text (unformatted).

    Google Calendar recently introduced *basic* formatting options for Google event descriptions including bold, italics, underline, bullet points and links. gSyncit has been updated to support the translation process between HTML (Google Event) and RTF (Outlook Event) supporting the limited subset of formatting allowed by Google events.

    It is highly recommened to make a backup of your Outlook and Google calendars before enabling this option during the beta period. To enable HTML formatting sync select the 'Other' tab on the gSyncit Google calendar sync mapping and enable the option to "Sync Google event HTML formatting" as shown in the image below.    

v5.0.132 - January 2018 [January 24th, 2018]
  • FIX: Corrects issue syncing user defined fields with Todoist fields.

  • FIX: Corrects object reference error when syncing undefined/empty Todoist project name.

  • FIX: Corrects null reference error when syncing with Todoist.

  • FIX: Corrects issue in v5.0.127 beta syncing Todoist project/label with user-defined fields.

  • FIX: Corrects issue with unexpected delete request when syncing Informant Calednar & using the sync options to set the Google calednar sync range. These settings were conflicting causing the root issue.

  • FIX: Corrects issue syncing Informant calendar event reminder set to "0 minutes."

v5.0.124 - January 2018 [January 12th, 2018]
v5.0.123 - January 2018 [January 1st, 2018]
v5.0.119 - December 2017 [December 14th, 2017]
v5.0.115 - November 2017 [November 20th, 2017]
v5.0.109 - November 2017 [November 3rd, 2017]
v5.0.107 - October 2017 [October 27th, 2017]
v5.0.106 - October 2017 [October 20th, 2017]
v5.0.105 - October 2017 [October 17th, 2017]
v5.0.103 - October 2017 [October 16th, 2017]
v5.0.101 - October 2017 [October 5th, 2017]
v5.0.94 - September 2017 [September 29th, 2017]
v5.0.91 - September 2017 [September 21st, 2017]
v5.0.90 - September 2017 [September 21st, 2017]
v5.0.72 - September 2017 [September 4th, 2017]
v5.0.71 - August 2017 [August 29th, 2017] (Official Release)